Contract value
£660k
Architect
IPA Architects
Main contractor
Connor Construction (Watford) Ltd
Consulting Engineer
FG Alden
Services

Air Conditioning
Heating & Hot Water
Domestic Services
Mechanical Ventilation
Above Ground Drainage
Automatic Controls
Smoke Extract
Sanitaryware

Project overview

The project entailed the refurbishment of the entire hotel, new gas fired boiler plant was installed serving traditional style radiators throughout the hotel reflecting the hotels period charm.

Upgrades in domestic hot and cold-water plant, new constant volume extract ventilation from the ensuite bathrooms, air conditioning to the bedrooms and basement bar plus smoke ventilation to the escape corridors completed this sympathetic refurbishment.

Other recent projects

Take a look at some of Alden’s most recent projects.

Privacy Preference Center